The 400 series combines a sheathed thermocouple, fiberglass-insulated compensation lead and connector. A transition tube connects the sensing sheath to the lead; its threaded tail accommodates a tapered spring. Insulated, grounded and exposed junctions are available in 4.8mm or 6.4mm sheath diameters.
| Model | Element | Sheath material | Sensing range | Accuracy |
|---|---|---|---|---|
| 400-K | K | 304SS or 316SS | 0-800°C | ±0.4%t |
| Inconel600 | 0-1100°C | |||
| 400-E | E | 304SS or 316SS | 0-600°C | |
| Inconel600 | 0-800°C | |||
| 400-J | J | 304SS or 316SS | 0-500°C | |
| Inconel600 | 0-700°C | |||
| 400-T | T | 304SS or 316SS | 0-350°C |
| Applicable models | Insertion | Transition length | Compensation lead length | Joint | Lead conductor | Termination |
|---|---|---|---|---|---|---|
| 400-K, 400-E, 400-J or 400-T | 355mm or user-specified | 35mm | 9145mm or user-specified | Silver-copper welding | Single conductor, 0.8mm diameter | Connector |
Other probe dimensions can be supplied to suit the installation.